CM Canopen Manager transition from "Pre-Operational" to "Operational"

Hello,

The manual talks about using the PLC to switch the CM Module from the “Pre-Operational” mode to the “Operational” mode. I cannot figure out how to do that within TIA. I am using the Demo for TIA 13.

I am using S7 1200 1214C DC/DC/DC with the CM CanOpen module set as the CanOpen Manager.

I figured it out. I needed to have at least 1 slave correctly wired into the network. Once I did that, the module went into Operational Mode.